Support QRP CoA Everywhere

Thursday 7 November 2013

New shack

Last bits for the inside now done.

Office side been done for a while now







Operating bench.
(wooden trim to be fitted, and doors on units)



Vintage side:
(some extra sockets to go in to left of ones on wall)



Modern/Contest:


The operating bench will be painted with multiple layers of polyurethane varnish.

There may be an extra hole drilled in the corner and to the rear on the bench for cables and an earthing 22mm copper pipe will go along the wall to an RF earth outside the shack side.

No comments: